Log in
Forum
Topic

Question about Innovation: Purchasing- lamps for LEED v4 ID+C

CI-v4 INc1: Innovation
posted by Courtney Royal on Apr 10, 2020, 11:15 am

I am confused, if you wanted to use this credit as an Innovation credit in a v4 ID+C project, does the entire...

Last reply: Catarina Costa Goncalves, May 22, 2024, 11:54 am

Purchasing- Lamps: EXIT signs

NC-v4 INc1: Innovation
posted by Edgar Arevalo on Feb 5, 2024, 3:14 pm

I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator.  Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and...

Last reply: Catarina Costa Goncalves, May 22, 2024, 11:52 am

LEED BD+C: New Construction

LEED v5 BD+C/ID+C: Overall and Appendix Public Comments
posted by Andrea Wald on May 22, 2024, 12:34 am

LEED certification needs to address the topic of artificial turf. Specifically, a prerequisite for LEED certification should be that the design includes no artificial turf. Credits and points...

LEED v5 O&M Existing Buildings public comments

LEED v5 O&M Existing Buildings Public Comments
posted by Nadav Malin on Apr 2, 2024, 1:57 pm

Share your comments on the first public comment draft of LEED v5 O+M Existing Buildings on this forum. You can either reply to this thread or use the "Post a Question/Comment" button to start a...

Last reply: Lyle Axelarris, May 22, 2024, 9:41 am

No-Cooling Tower for full credit? Option 2- Optimize Water Use for Cooling- 100% Reduction

CS-v4.1 WEc3: Optimize Process Water Use
posted by Grace Friedhoff on Feb 24, 2022, 3:08 pm

I am working on a C&S project that has a baseline system designated for the building using ASHRAE 90.1-2016 Appendix G Table G3.1.1 that includes a cooling tower (system 7) AND there is no...

Last reply: Kathy Collins, LEED AP , WELL AP, May 22, 2024, 9:12 am

LEEDv5 O+M Public Comment: Building Enclosure retrofit design

LEED v5 O&M Existing Buildings Public Comments
posted by Lyle Axelarris on May 22, 2024, 9:03 am

I’m very disappointed to STILL see no LEED credit address moisture management in building envelope design.  As our industry is adding continuous insulation (for good reasons), there are more and...

Case 2 Demand Response Capable Building with a "future" program

NC-v4.1 EAc4: Grid Harmonization
posted by Chris Flint Chatto on May 27, 2021, 8:11 pm

Is case 2 only available to projects with utilities that don't have...

Last reply: AJ Ahmed, May 22, 2024, 7:21 am

LEED v5 BD+C/ID+C Materials and Resources public comments

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by Nadav Malin on Apr 3, 2024, 6:25 am

Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Materials and Resources category on this forum. You can reply to this thread or use the "Post a Question or Comment...

Last reply: Pieter Ballieu, May 22, 2024, 5:54 am

Native plants = No Irrigation Required?

NC-v4 WEc1: Outdoor water use reduction
posted by Yoyo Shek on Jan 24, 2022, 6:40 am

Hi All,

Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:

A landscaping plan showing native plants may be provided to confirm that irrigation will not...

Last reply: Lateef Kayode Akamo, May 22, 2024, 5:21 am

LEED v5 O&M Existing Buildings

LEED v5 O&M Existing Buildings Public Comments
posted by Richard Curry on May 20, 2024, 1:33 pm

My name is Richard Curry, and my comments represent the views of ST Facility Maintenance Consulting, LLC, a facility service consultant to owners and operators of commercial cleaning companies. ...

Last reply: Krista Maylin, May 22, 2024, 4:49 am