New Requirement? CDPH Emissions Testing Under Certain Conditions?

NC-v4.1 EQc2: Low-emitting materials
posted by Brian Salazar on May 8, 2024, 9:46 am

I have recently had LEED review for LEM kicked back because the Greenguard Gold or other material certificates were presumed under CDPH v1.2 for Classroom environment vs Office environment. I...

Last reply: Denise Bevilaqua, May 8, 2024, 10:20 am

LEED certification for advanced construction process

LEED Rating System Selection
posted by Glenn Roosen on Mar 26, 2024, 8:40 am

Good afternoon,

I have a question regarding a project that is in the end phase of the construction works (final delivery of the building in September 2024), and they would like to see if a...

Last reply: Andrey Kuznetsov, May 8, 2024, 4:28 am

BD+C: Multifamily Midrise or New Construction?

LEED Rating System Selection
posted by Victoria Rios Esteve on Sep 20, 2021, 6:08 pm

Hi everyone! 

We have some doubt on which would be the most suitable rating system for a project. It is a 9-stories residential building. So, we believe it can be either BD+C: Multifamily...

Last reply: Andrey Kuznetsov, May 8, 2024, 4:12 am

Residential High-Rise: BD+C New Construction vs. LEED Homes

LEED Rating System Selection
posted by Vitor Leite Goncalves on Jun 30, 2023, 12:56 pm

Hello all,

The project is a 6-story residential building located in the United States. USGBC website says that...

Last reply: Andrey Kuznetsov, May 8, 2024, 4:03 am

Lack of Bicycle Network Facility

CS-v4 LTc6: Bicycle facilities
posted by Junaid Khan on Aug 8, 2018, 1:41 am

Hi

Our firm is currently working on a core & shell project of an office building. We've designed a bicycle facility in accordance with the LEED credit compliance, within the building...

Last reply: Brightworks Sustainability, May 7, 2024, 11:53 pm

Interiors Life-Cycle Impact Reduction- Option 3 Design for Flexibility

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Laura Riegle on Jul 13, 2022, 9:26 am

Hi, 

I am persuing the "Interiors Life-Cycle Impact Reduction" credit,  Option 3: Design for Flexibility for a CI project.

In the project, there are concrete floors (no systems to...

Last reply: Brightworks Sustainability, May 7, 2024, 9:27 pm

Timeline to join for project team

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Christoph Weindl on Sep 25, 2020, 11:27 am

We're pursuing "Social equity within the project team" with Option 2.

Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years...

Last reply: Robert Gomez, May 7, 2024, 7:52 pm

SRI VALUE OF SOLAR ROOF

NC-v4 SSc5: Heat Island Reduction
posted by Shameen Dharmasena on Nov 4, 2021, 7:26 am

Hello, 

If a roof totally covered with Solar Panels, then how to calculate...

Last reply: Talia Mamayek, May 7, 2024, 4:35 pm

All Gender Restrooms- Conversations with Project Teams

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Annalise Dum on Sep 29, 2022, 1:08 pm

What have teams found as successful ways to integrate all-gender restrooms into their projects? As a consultant, sometimes it is difficult to convince the client that individual occupant (and all...

Last reply: Bethany Beers, May 7, 2024, 4:04 pm

Energy and Atmosphere

LEED v5 O&M Existing Buildings Public Comments
posted by Birgitte Messerschmidt on May 7, 2024, 2:18 pm

Add that if installing Battery Energy Storage systems this should be done in accordance with NFPA 855.